Workshop Side Loft Space – Cleared and Boards Lifted » Workshop Side Loft Space – Cleared and Boards Lifted

Workshop Side Loft Space - Cleared and Boards Lifted

Workshop Side Loft Space – Cleared and Boards Lifted

The inside of the hackspace loft having been cleared of all equipment and material. All the flooring has been lifted and stacked ready for treatment.

This entry was posted on Sunday, October 15th, 2023 at 5:39 pm and is filed under . You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.

Comments are closed.